We were asked to renovate this house from the 60's and transform it into an high performance energy home. To succeed, we had to :

  • isolate completely the house (facades, roof, basement's cieling)
  • change windows for triple panes glass
  • stretch out the west facade in order to
    • benefit from the afternoon sun
    • create an airlock at the entrance
  • install floor heating system
  • provide a "heat recovery" ventilation
  • construct a Canadian well
Reduce energy consumption and increase home confort while preserving the environnement.
Energy consumption
Surface of energy reference : 189 m2
Index calculated energy expediture : 156 Mj/m2 meaning 43 kWh/m2 per year(env. 4 l heating oil par m2/year)
Project team : Etienne and Lugrin
Building construction
Date of autorisation's deposition: December 2006
Beginning  : May 2007
Duration : 6.5 months