REALISATION: MINERGY RENOVATION IN SEZEGNIN
We were asked to renovate this house from the 60's and transform it into an high performance energy home. To succeed, we had to :
- isolate completely the house (facades, roof, basement's cieling)
- change windows for triple panes glass
- stretch out the west facade in order to
- benefit from the afternoon sun
- create an airlock at the entrance
- install floor heating system
- provide a "heat recovery" ventilation
- construct a Canadian well
Reduce energy consumption and increase home confort while preserving the environnement.
Energy consumption |
Surface of energy reference : |
189 m2 |
Index calculated energy expediture : |
156 Mj/m2 meaning 43 kWh/m2 per year(env. 4 l heating oil par m2/year) |
Project team : |
Etienne and Lugrin |
|
Building construction |
|
Date of autorisation's deposition: |
December 2006 |
Beginning : |
May 2007 |
Duration : |
6.5 months |